2121
|
Monday, July 06, 2020, 12:20 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Five shielding blocks to ITW | Five shielding blocks are transferred to
ITW |
|
2205
|
Thursday, March 25, 2021, 10:38 |
David Wang | Spent Target Vault | Standard Operation | | C#1 | Remove pail 237 spent target C#1 from storage vault to mini storage. | Pail 237 only has 200u sv/hr field at 0.5
meter. On contact measurement: 0.9 to 1.6
m sv/hr.and less than 80 count contamination |
|
2116
|
Friday, July 03, 2020, 07:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | BEFORE TARGET INSTALLATION | ELECTRICAL CHECK BEFORE TARGET INSTALLATION. | PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500
V. THE REST ARE OL |
|
653
|
Wednesday, April 30, 2014, 12:03 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault | The 2A3 window now has a lid, and lift
yolk on it and it has been installed in the
spent target vault in spot 2A. The lid is |
|
1462
|
Friday, March 24, 2017, 11:19 |
Keith C Ng | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault |
|
|
1463
|
Friday, March 24, 2017, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A window | 2A window has been removed from the vault. | 2A window has been removed from the vault
and moved over the cyclotron vault tunnels.
Attached is the updated storage vault list. |
|
94
|
Tuesday, April 24, 2012, 10:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | LP SIS Nb6 | TM1 heat shield circuit leak check with Nb5 |
Normal
0
|
|
295
|
Friday, April 12, 2013, 10:27 |
David Wang | ITW | Standard Operation | TM1 | | I reconnected TM1 to ITW. | TM1 has been reconnected in ITW. Water
interlock check for TM1 is done. |
|
4
|
Thursday, June 30, 2011, 16:04 |
Pierre Bricault | Conditioning Station | Repair | TM1 | | TM1 status | Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS) |
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
![IMG_1681.JPG IMG_1681.JPG](attachment.png) ![IMG_1662.JPG IMG_1662.JPG](attachment.png) ![IMG_1686.JPG IMG_1686.JPG](attachment.png) |
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
14
|
Wednesday, July 27, 2011, 14:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | | Module move | TM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37. |
|
39
|
Tuesday, October 25, 2011, 16:57 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pump 1 issues | Roughing on TM1 started at ~15:00 today
by ~16:30 the module had reached a pressure
of ~200 mTorr and the turbo pumps were turned |
|
41
|
Friday, October 28, 2011, 09:30 |
chad fisher | South Hot-Cell | Repair | TM4 | | Tube Heater + Leak Check C.B. | Base Pressure: 0.0x10-4
Stable Leak Rate: 0.0x10-9
Leak check of tube heater circuit, |
|
43
|
Friday, October 28, 2011, 14:29 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Leak Check on October 27/10/2011 | A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made |
|
44
|
Friday, October 28, 2011, 14:42 |
Bevan Moss | South Hot-Cell | Maintenance | TM4 | | Leak check on service cap feed through | After Chad and Davids leak check
results from the containment box it was decided
to perform a leak check on the feed through |
![IMG_1906.JPG IMG_1906.JPG](attachment.png) ![IMG_1905.JPG IMG_1905.JPG](attachment.png) |
46
|
Tuesday, November 01, 2011, 11:50 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 leak test on conditioning station | I did a leak check again on TM4 today.
This time, the leak detector pump to the
bottom on both base pressure(0.0xE-4 torr) |
|
49
|
Thursday, November 10, 2011, 14:33 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | For the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows: |
|
51
|
Tuesday, November 15, 2011, 13:08 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | | Move ot TM#1 | TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well. |
|
60
|
Monday, November 21, 2011, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 full leak check in conditioning station | TM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium |
|