Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2262     Entry time: Tuesday, November 09, 2021, 09:58
Author: Frank Song 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: C#3 
Subject: module disconnection 

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Attachment 1: IMG_4315.jpg  108 kB  | Show | Hide all
ELOG V2.9.2-2455