Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2156     Entry time: Monday, October 19, 2020, 12:52
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: C#2 
Subject: TM2 electrical and leak check at SHC 

TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  

Attachment 1: Tm3_bunker_set_up_018.JPG  2.579 MB  | Show | Hide all
ELOG V2.9.2-2455