Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2156
Entry time:
Monday, October 19, 2020, 12:52
Author:
David Wang
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM2
Target/Number:
C#2
Subject:
TM2 electrical and leak check at SHC
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.
Attachment 1:
Tm3_bunker_set_up_018.JPG
2.579 MB
|
Show
|
Hide all
ELOG V2.9.2-2455