  RH-ISAC, Page 70 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4

Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.

The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down.

Upon inspection we found the container looked pretty damaged - highly crystallized and distorted. The container had gone banana-shaped, but not in the usual direction. It had curved  in the direction of the ion source (see photos). The heat shield and other surrounding components were super clean, no deposits or marks at all.

Attachment 1: 20221122_152435.jpg
20221122_152435.jpg
Attachment 2: 20221122_153033.jpg
20221122_153033.jpg
Attachment 3: 20221122_152407.jpg
20221122_152407.jpg
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection

 TM2 been connected with new target C#3 in ITW. 

Attachment 1: IMG_3711.jpg
IMG_3711.jpg
Attachment 2: IMG_3712.jpg
IMG_3712.jpg
Attachment 3: IMG_3713.jpg
IMG_3713.jpg
Attachment 4: IMG_3714.jpg
IMG_3714.jpg
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test

 the test was done when TM2 sit on NHC.

Attachment 1: IMG_3710.jpg
IMG_3710.jpg
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Attachment 1: IMG_4315.jpg
IMG_4315.jpg
  2266   Wednesday, November 10, 2021, 11:06 Travis CaveSpent Target VaultStandard Operation C#3Spent Target Move

 The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-10.pdf
Target_Index_2021-11-10.pdf Target_Index_2021-11-10.pdf Target_Index_2021-11-10.pdf
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHC

TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  

Attachment 1: Tm3_bunker_set_up_018.JPG
Tm3_bunker_set_up_018.JPG
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move

 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.

  2167   Thursday, November 19, 2020, 12:00 Adam NewsomeSpent Target VaultStandard Operation C#2Spent Target Move

C#2 has been moved from the south hot cell to the spent target vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr upon removal from the south hot cell.

The Target Index spreadsheet has been updated on DocuShare.

  2103   Wednesday, June 17, 2020, 09:49 chad fisherSouth Hot-CellStandard OperationTM4C#1C#1 installed

Target C#1 has been installed on TM4 with new high current fasteners torqued to 130in lbs.

 

 

Attachment 1: C#1_Target.jpg
C#1_Target.jpg
  2104   Wednesday, June 17, 2020, 09:53 David WangSouth Hot-CellStandard OperationTM2C#1C#1 target electrical check and leak check at SHC.

Target to HS is 400 ohm. The rest check is good. See attachment.

Attachment 1: C#1_target_electrical_and_leak_check.pdf
C#1_target_electrical_and_leak_check.pdf
  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.

Remotely remove TM2 from ITW to SHC. The move is good.  Shielding plug is put back to ITW.

  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST

SEE ATTACHMENTS. EVERYTHING IS GOOD.

Attachment 1: TM2_C#1_CONNECTION_CHECKLIST.pdf
TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf TM2_C#1_CONNECTION_CHECKLIST.pdf
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITW

Five shielding blocks are transferred to ITW

  2205   Thursday, March 25, 2021, 10:38 David WangSpent Target VaultStandard Operation C#1Remove pail 237 spent target C#1 from storage vault to mini storage.

Pail 237 only has 200u sv/hr field at 0.5 meter. On contact measurement: 0.9 to 1.6 m sv/hr.and less than 80 count contamination outside the pail.   It is moved to mini storage. We will transfer this pail to cyclotron vault and store it there later.

  2116   Friday, July 03, 2020, 07:03 David WangSouth Hot-CellStandard OperationTM4BEFORE TARGET INSTALLATIONELECTRICAL CHECK BEFORE TARGET INSTALLATION.

PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500 V. THE REST ARE OL

Attachment 1: TM4_ELECTRICAL_CHECK_20220_07_02.pdf
TM4_ELECTRICAL_CHECK_20220_07_02.pdf
  653   Wednesday, April 30, 2014, 12:03 Travis CaveSpent Target VaultStandard Operation 2A3 windowWindow now in vault

The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.

Attachment 1: Vault_Storage_April_30_2014.pdf
Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf
  1462   Friday, March 24, 2017, 11:19 Keith C NgSpent Target VaultStandard Operation 2A3 windowWindow now in vault

Travis Cave wrote:

The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.

The pail containing window was transferred from the Storage Vault to the Cyclotron Vault Tunnel Storage 2017 Mar 24. It was placed in a brick bunker along the north wall and marked with item #1434. RPG storage form is attached.

Highest field measured at 0.5 m was 3000 uSv/h with an estimate of 4000 uSv/h on contact with the pail. Pail exterior was not contaminated. See attached storage form for details.

 

Attachment 1: 2017mar24_vault_tunnel_storage_form(1).pdf
2017mar24_vault_tunnel_storage_form(1).pdf
  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.

2A window has been removed from the vault and moved over the cyclotron vault tunnels.  Attached is the updated storage vault list.

Attachment 1: Vault_Storage_March_24_2017.pdf
Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf
  94   Tuesday, April 24, 2012, 10:38 David WangConditioning StationStandard OperationTM1 LP SIS Nb6TM1 heat shield circuit leak check with Nb5

 The pumping down on TM1 and conditioning station is fine over the weed end. The PNG 1(containment box) is 2.4xe-6 Torr, the IG1 (top service cap) is 9.0 xE-7 Torr, and the IG4 is 1.9xE-6Torr (diagnostic box). At this pressure, I connected the leak detector to the system and applied 80psi helium to the heat shield circuit. The leak rate and base pressure on leak detector are 0.0xE-9 Atm.cc/sec and 0.0xE-4Torr. There is no any response on leak detector during 4mins helium applying time. So the heat shield and Nb5 target water circuit is completely leak tight.

  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.

TM1 has been reconnected in ITW. Water interlock check for TM1 is done.