Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 144     Entry time: Monday, July 09, 2012, 10:51
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UO#3 
Subject: module move 

TM#4 with UO#3 from the conditioning station to the east target station. Move went well.

ELOG V2.9.2-2455