Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 152     Entry time: Tuesday, July 31, 2012, 10:50
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#38 
Subject: module move 

TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move.

ELOG V2.9.2-2455