Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 153     Entry time: Tuesday, July 31, 2012, 12:24
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx#4 
Subject: UCx#4 Installed 

Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.

During module move to the hot cell UCx#4 was housed in a bag under argon.

ELOG V2.9.2-2455