1441
|
Monday, February 27, 2017, 14:23 |
chad fisher | South Hot-Cell | Repair | | | Manip. 'Z' motion cable run through | Aaron and I successfully completed a run
through on the procedure to replace the 'Z'
motion cable. I will be writing up the procedure |
|
1440
|
Friday, February 24, 2017, 15:12 |
Isaac Earle | North Hot-Cell | Development | | | NHC interior walls/floor/ceiling re-finished, sealed, and painted | The North Hot Cell interior walls, floor,
and ceiling were re-finished, sealed, and
painted by Omni Coating from Feb 6 - 17 under |
8x |
1439
|
Wednesday, February 15, 2017, 12:07 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator 'Z' motion cable replacement preparation status | Aaron and I completed assembling (re-assembling)
the clean spare on Tuesday, February 14th
to assist in determining a procedure for |
|
1438
|
Friday, February 10, 2017, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | water has been refilled to TCS:TK2 | TCS:TK2 , Water has been refilled to 28.5"
level. It was 15.1". Fall protection
equipment are used during the job. |
|
1437
|
Thursday, February 09, 2017, 14:07 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Shielding Window Gaskets Changed | The North Hot Cell shielding window
gaskets have been changed and the window
has been filled with new oil. Although |
23x |
1436
|
Thursday, February 09, 2017, 09:24 |
David Wang | Conditioning Station | Development | | | Target module window cooling lines at TCS. | Target module window cooling lines
at TCS has been modified to use spare 2 channel
in TCS: WFB1. The old cooling lines used |
|
1435
|
Tuesday, February 07, 2017, 15:57 |
Isaac Earle | North Hot-Cell | Development | | | Ventilation Ducting Gasket Installed | Lead gasket IRH1633 was installed
today according to assembly drawing IRH1618
Rev B. |
|
1434
|
Tuesday, February 07, 2017, 10:34 |
David Wang | ITW | Maintenance | | | ITW clean up | ITW has been cleaned up today. All
station are vacuum cleaned. I wiped all HV
cover and HV area including conductors and |
|
1433
|
Friday, February 03, 2017, 11:49 |
David Wang | Conditioning Station | Standard Operation | | | Update 2017 winter shutdown TH schedule. | Update 2017 winter shut down target hall
schedule. See attachments |
|
1432
|
Wednesday, February 01, 2017, 12:23 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been connected in ITE. | TM2 has been connected in ITE. The SST
window water lines in ITE can not be connected
properly to TM2. The water line connector |
|
1431
|
Friday, January 27, 2017, 10:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been moved from TCS to ITE | The move is successful. |
|
1430
|
Friday, January 27, 2017, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | | | UCx#18 and Ta#50 autopsy and spent target move | On Thursday, January 26th UCx#18 and Ta#50
were inspected and packaged into spent target
pails, move to storage vault. |
|
1429
|
Friday, January 27, 2017, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#50 | Ta#50 Removed | Ta#50 has been was removed from TM4 on
Wednesday, January 25th. |
|
1428
|
Friday, January 27, 2017, 08:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#50 | UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interference | On Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new |
|
1427
|
Tuesday, January 24, 2017, 15:32 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was moved from ITW to SHC this morning. | The move is smooth. Yasmine and Travis
did the move. |
|
1426
|
Tuesday, January 24, 2017, 15:29 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been moved to TCS . | I connected TCS vacuum system to TM2. The
station is under roughing now. All turbo
pumps will be started soon. |
|
1425
|
Tuesday, January 24, 2017, 15:24 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 electrical check and leack check. | I did electrical check before and after
Fefiad target installation on TM2. The RU
(coil) Is till short to 60KV as before. Other |
|
1424
|
Thursday, January 19, 2017, 10:15 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for 2017 winter shut down | Updated target hall schedule for 2017 winter
shut down. See attachments 1,2
Update schedule after Febiad beam |
|
1423
|
Wednesday, January 18, 2017, 11:53 |
Isaac Earle | North Hot-Cell | Development | | | NHC partition wall installation complete | The final panels of the partition
wall were installed today as per drawing
IRH1609. Sealing, finishing, and painting |
|
1422
|
Wednesday, January 18, 2017, 09:55 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 2017 winter shut down leak check. | ITE and TM4 2017 winter shut down leak
check are finished. All ITE primary, secondary
vacuum vessel and TM4 water lines are good. |
|