Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1424     Entry time: Thursday, January 19, 2017, 10:15
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Target Hall schedule for 2017 winter shut down 

Updated target hall schedule for 2017 winter shut down. See attachments 1,2

Update schedule after Febiad beam schedule changed to ITE. See attachments 3,4

Attachment 1: 2017_Winter_Shut_Down_Target_Hall_Schedule.mpp  249 kB
Attachment 2: 2017_Winter_Shut_Down_Target_Hall_Schedule.pdf  132 kB  | Show | Hide all
Attachment 3: 2017_Winter_Shut_Down_Target_Hall_Schedule.mpp  254 kB  Uploaded Monday, January 23, 2017, 14:26
Attachment 4: 2017_Winter_Shut_Down_Target_Hall_Schedule.pdf  138 kB  Uploaded Monday, January 23, 2017, 14:27  | Show | Hide all
ELOG V2.9.2-2455