Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1428     Entry time: Friday, January 27, 2017, 08:44
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#50 
Subject: UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interference 

On Tuesday, January 24th UCx#18 was removed from TM2 and Ta febiad dummy installed. I encountered the same issue mounting the new target as last time. Was able to determine that the issue is the routing of the waterlines to the right-hand (as viewed from the operator) high current tube heater. The lines interfer the the target mounting plate (bottom right hand corner).

Attachment 1: TM2_Waterline_interference.jpg  2.393 MB  | Show | Hide all
ELOG V2.9.2-2455