Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1433     Entry time: Friday, February 03, 2017, 11:49
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Update 2017 winter shutdown TH schedule. 

Update 2017 winter shut down target hall schedule. See attachments

Attachment 1: 2017_Winter_Shut_Down_Target_Hall_Schedule.mpp  267 kB
Attachment 2: 2017_Winter_Shut_Down_Target_Hall_Schedule.pdf  134 kB  | Show | Hide all
ELOG V2.9.2-2455