Entry  Monday, April 22, 2013, 11:35, Bevan Moss, Conditioning Station, Repair, TM3, N/A, TCS:DIF2 broken 
 The flow meter on the primary side (TCS:DIF2) of the conditioning station is broken. I investigated and there is flow, the gauge is not fouled,
and the PLC does read back when current supplied. The gauge is also reciving 24V but the output is 0V and 0mA. I will contact ESC and the supplier.
Entry  Tuesday, April 23, 2013, 11:19, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, HV Test All common TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip
 A HV test was conducted yesterday on TM3. There was no target and all items were tied to common or ground. The conductivity of the water ranged
from 7.1 to 7.5 Mohm. 40kV @ ~600uA without continuous sparking was achieved. The Strip tool was run but something went wrong with the export and the vacuum
gauge data is missing. I have attached the file for reference and the pulled data from the achiver (only logs every 300 seconds). RGA scans were taken
Entry  Tuesday, April 23, 2013, 13:48, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, EL testing 23042013_TM3_EL_RGA.zip23042013_TM3_EL_39.csv
This morning the Einzel Lens was tested on TM3 as the intention is to reuse this piece of equipment. The EL was able to achieve 39.9kV at ~1.35mA before
a major spark happened and the power supply turned off. Also during testing the penning gauge suddenly shot up after a spark, it did not recover and had
been acting strange in previous test, it was decided to ignore its value and continue testing but it should be replaced in the future. When I went to save
Entry  Tuesday, April 23, 2013, 15:52, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, Further HV Testing TM3_BIAS_EE_CB_23042013.xlsxTM3_BIA_EE_CD_23042013_RGA_files.zip
 Further HV testing was completed today from ~2:00 until 3:00. The resistivity of the water was 11.7 - 12.7 Mohm. The EE was turned on to 1500 V
and had a leakage current of 1.465 mA with a inline and ballast resister of 20 kohm and 1 Mohm respectively. In addition to this all of the CB were turned
on to 500V. The voltage on the source tray with all bias items tied together and the voltage was then raised to 30kV in 5kV steps. It was then raised until
Entry  Tuesday, April 23, 2013, 15:59, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, Systems off 
 Both the Cooling Package and Vacuum have been turned off in preparation for the module move tomorrow
Entry  Tuesday, April 23, 2013, 16:11, Bevan Moss, Conditioning Station, Maintenance, TM3, N/A, Chiller Fault 2 
 During Testing it was noticed that Fault 2 was indicated and one of the compressors would not run. Fault 2 does not indicate what the issue was
and during inspection nothing could be detected. It had something to do with TCS:CHILCP3 and possibly CP2. CP1 could still be operated and was controlled
manually to keep the temperature in the correct range. This was not required but it does affect the conductivity. The main power switch on the chiller
    Reply  Monday, May 13, 2013, 14:59, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, EL testing TM3_EL_39.9kV_23042013.txt


    
        
            Bevan Moss wrote:
        
        
            
            This morning the Einzel Lens was tested on TM3 as the intention is to reuse this piece of equipment.
    Reply  Monday, May 13, 2013, 15:10, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, HV Test All common TM3_40kV_22042013.xlsx


    
        
            Bevan Moss wrote:
        
        
            
             A HV test was conducted yesterday on TM3. There was no target and all items were tied to common
Entry  Thursday, August 29, 2013, 17:16, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 
 Today Chad entered the south hot cell on work permit 2013-08-29-3 to repair the leaking heat shield line. The heat shield line was removed from
the module and the surfaces cleaned. New C seals and spring were inserted and the line re-attached. During this time Chad also installed the new vacuum
gauge. Grant took video of this work and Keith some pictures. The video and pictures can be found on the M: drive (groups) in the RH folder. The total
    Reply  Friday, August 30, 2013, 10:27, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 


    
        
            Bevan Moss wrote:
        
        
            
             Today Chad entered the south hot cell on work permit 2013-08-29-3 to repair the leaking heat shield
    Reply  Friday, August 30, 2013, 14:55, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 


    
        
            Bevan Moss wrote:
        
        
            
            
            
Entry  Wednesday, February 14, 2024, 11:34, Adam Newsome, Spent Target Vault, Standard Operation, , Misc., Three pails moved from main vault to mini vault Target_Index_2024-02-14.xlsm
In preparation for F-308 loading, three pails were moved from the main storage vault to the mini storage vault. The following pails were moved:

    Pail 270 (C#3)
    Pail 276 (UC#39)
    Pail 231 (UC#41)

 
Target Index spreadsheet updated, attached.
Entry  Tuesday, June 28, 2016, 14:42, Travis Cave, Spent Target Vault, Standard Operation, , Many, Spent target assay. Vault_Storage_June_30_2016.pdfMini_Vault_Storage_June_30_2015.pdf
The spent target assay were finally started or re-started today. Four targets were done today.
June 29 2016 another four targets were done today.
June 30 2016 all targets have assayed and measured. see the attached PDFs for the results.
Entry  Monday, March 05, 2018, 13:47, Travis Cave, Spent Target Vault, Repair, , Many, Spent Target Assay 
 The spent target assay was aborted today after the first target was finished due to the very old computer that controls the camera and the vault
door effectively died. The vault door had to be closed using the emergency door closing winch which worked so it passed that test.
Entry  Friday, March 23, 2018, 09:34, Travis Cave, Spent Target Vault, Standard Operation, , Many, Spent Target Assay Target_Index_2018-03-23.pdf
 All targets in the ISAC Spent Target Vault have been either assayed and had field measurement done on them or just measurement if to hot to assay.
Entry  Monday, December 03, 2012, 19:34, Grant Minor, ITE, Standard Operation, TM4, LpUCx, Argon supply opened for ITE vent Argon_Vent_ITE_Cylinder_Pressure_3Dec2012.jpgArgon_Vent_ITE_Secondary_Regulator_Pressure_Relief_3Dec2012.jpgArgon_Vent_ITE_Needle_Valve_3Dec2012.jpg
Around 7pm tonight I opened the main valve approximately 1.5 turns on  the Argon bottle used for venting ITE, located in the ISAC electrical  room. 
The cylinder pressure gauge increased to about 1500 psi.  I  adjusted the secondary regulator (pressure relief valve) until it read  2psi.  I opened the
needle valve in the vent line completely.  The  pressure on the pressure relief valve dropped slightly and I adjusted it  again until it read 2psi.  The
Entry  Wednesday, November 28, 2018, 07:04, David Wang, ITE, Development, TM4, LpTa 56, New high current flexible cables inspection after LpTa#56 beam run. new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine.
Entry  Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
 David Wang made E/L checking before module moving to ITW. read attachment pls.
Entry  Tuesday, May 21, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, Lp Febiad empty, Tm4 has been disconnected in ITW. TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
Tm4 has been disconnected in ITW per document 141576. Checklist is done.  HS line is purged.
Entry  Monday, August 17, 2015, 10:44, Anders Mjos, Conditioning Station, Development, TM2, LP-FEBIAD Test Target (empty), Conditioning TM2 Source Tray with FEBIAD test target FirstBeamTM2SourceTray2015-08-17.pngTM2_Source_Tray_with_FEBIAD_test_target.docx
TGHT, TBHT, ANODE and COIL power tested (some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE to 15/7.5/1.5 kV
Monday, August 17, 2015, 10:45 : COIL 20A, ANODE 200V