Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 132     Entry time: Thursday, June 21, 2012, 14:33
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number: N/A 
Subject: Pictures TM3 June 21st 

Here are the pictures from today...there is video too but it is not uploaded yet.

Attachment 1: DSC_2736.JPG  3.524 MB  | Show | Hide all
Attachment 2: DSC_2737.JPG  5.235 MB  | Show | Hide all
Attachment 3: DSC_2738.JPG  3.864 MB  | Show | Hide all
Attachment 4: DSC_2739.JPG  4.153 MB  | Show | Hide all
Attachment 5: DSC_2740.JPG  5.518 MB  | Show | Hide all
Attachment 6: DSC_2741.JPG  5.309 MB  | Show | Hide all
Attachment 7: DSC_2742.JPG  4.714 MB  | Show | Hide all
Attachment 8: DSC_2743.JPG  4.812 MB  | Show | Hide all
ELOG V2.9.2-2455