  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been move from south
hot cell to the conditioning station.
  
  480   Monday, September 30, 2013, 16:00 Bevan MossSouth Hot-CellStandard OperationTM3NiO#2Electrical check

    

       
            
  
  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
  482   Monday, September 30, 2013, 16:04 Bevan MossConditioning StationRepairTM3NiO#2Ion gauge filament replacement  The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed
  
  484   Tuesday, October 01, 2013, 11:00 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkTM#3 with NiO#2 electrical check at conditioning
station under vacuum, see pdf for details.
 TM#3_elec_chk_NiO#2_CS2.PDF 
  485   Wednesday, October 02, 2013, 09:40 Bevan MossConditioning StationStandard OperationTM3NiO#2HP conditioningYesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool
 01102013_TM3_NiO2_TGHT_and_TBHT_ramp_up_eod.txt02102013_TM3_NiO#2_HP_testing_overnight_run.JPG02102013_TM3_NiO#2_HP_testing_overnight_run_archiver.JPG 
  489   Friday, October 04, 2013, 19:05 Grant MinorConditioning StationStandard OperationTM3NiO#2HP Conditioning - e-mail notes from Oct 2nd to Oct 4thI have compiled the e-mail comments from
people involved in High-Power Conditioning
of TM3 w/ the new Rev 3 source tray and NiO#2
  
  490   Friday, October 04, 2013, 19:39 Grant MinorConditioning StationStandard OperationTM3NiO#2TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pmHere is the change in the TCS vacuum after
heaters were turned off earlier today:
2:20 pm readings
  
  491   Saturday, October 05, 2013, 14:45 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2vacuum readingsIG1
8.0 e-7 T
  
  492   Sunday, October 06, 2013, 00:17 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2high voltage conditioninghigh voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro
  
  493   Sunday, October 06, 2013, 15:39 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2HEATERS STARTEDThe high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature
  
  494   Sunday, October 06, 2013, 17:08 Friedhelm AmesConditioning StationDevelopmentTM3NiO#2trip of all power suppliesAll power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice
  
  495   Sunday, October 06, 2013, 20:28 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2turbo pumps stoppedvacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T
  
  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module moveTM#3 has been moved from the conditioning
station to the east target station, move
went well.
  
  517   Tuesday, October 22, 2013, 14:23 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementsas measured today in the electrical room
by David and Anders
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf 
  529   Friday, October 25, 2013, 13:39 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf 
  532   Thursday, October 31, 2013, 11:38 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_EOB.pdf 
  548   Tuesday, November 19, 2013, 10:52 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 moved from ITE to the south
hot cell.
  
  551   Wednesday, November 20, 2013, 08:50 chad fisherSouth Hot-CellStandard OperationTM3NiO#2NiO#2 removedNiO#2 has been removed from TM3  TM3_20131120.jpgTM3_20131120_2.jpg 
  554   Thursday, November 21, 2013, 12:12 Anders MjosSouth Hot-CellStandard OperationTM3NiO#2End of beam target inspection - ANODE does not hold 250VThe target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found
  