Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 59 of 141  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  2215   Monday, May 03, 2021, 15:14 Frank SongITEMaintenance  High voltage test in ITE

 Anders and I prepared ITE high voltage test in April 30 ( Friday morning), The MAA is locked for this.

  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections

 TM4 electric check with new target was done by David. A pic attached here for ref.

Attachment 1: IMG_3603.jpg
IMG_3603.jpg
  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection

 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection checklist are attached here.

Attachment 1: IMG_3602.jpg
IMG_3602.jpg
Attachment 2: IMG_3601.jpg
IMG_3601.jpg
Attachment 3: IMG_3600.jpg
IMG_3600.jpg
Attachment 4: IMG_3599.jpg
IMG_3599.jpg
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection

 TM2 been connected with new target C#3 in ITW. 

Attachment 1: IMG_3711.jpg
IMG_3711.jpg
Attachment 2: IMG_3712.jpg
IMG_3712.jpg
Attachment 3: IMG_3713.jpg
IMG_3713.jpg
Attachment 4: IMG_3714.jpg
IMG_3714.jpg
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test

 the test was done when TM2 sit on NHC.

Attachment 1: IMG_3710.jpg
IMG_3710.jpg
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection

 TM4 was disconnected and moved to NHC. 

Attachment 1: IMG_3715.jpg
IMG_3715.jpg
Attachment 2: IMG_3716.jpg
IMG_3716.jpg
Attachment 3: IMG_3717.jpg
IMG_3717.jpg
  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests

 the tests were done when TM4 was on NHC. see attached photos please.

Attachment 1: IMG_3739.jpg
IMG_3739.jpg
Attachment 2: IMG_3740.jpg
IMG_3740.jpg
  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection

 the module with target UC#35 was connected in ITE and being pumped down.

Attachment 1: IMG_3742.jpg
IMG_3742.jpg
Attachment 2: IMG_3741.jpg
IMG_3741.jpg
Attachment 3: IMG_3743.jpg
IMG_3743.jpg
Attachment 4: IMG_3744.jpg
IMG_3744.jpg
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer

 the five shielding blocks have been moved from ITW to ITE. 

  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Attachment 1: IMG_4315.jpg
IMG_4315.jpg
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check

 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 

Attachment 1: IMG_4322.JPG
IMG_4322.JPG
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection

 TM2 with target UC#36 was connected at ITW.

Attachment 1: IMG_4323.JPG
IMG_4323.JPG
  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection

 the TM4 with UCx#35 was disconnected in ITE.

Attachment 1: IMG_4456_(2).JPG
IMG_4456_(2).JPG
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Attachment 1: IMG_4469.JPG
IMG_4469.JPG
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections

 electric check done in ITE. 

Attachment 1: tm4_with_Ta#63.jpg
tm4_with_Ta#63.jpg
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections

 electrical checked in ITW

Attachment 1: TM2_with_UCx36.jpg
TM2_with_UCx36.jpg
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target.

 An electric check was done right after module moving from SMP to SHC. 

Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
TM2_without_UCx36_at_SHC_(2).jpg
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

Attachment 1: tm4_with_Ta#63_on_NHC.jpg
tm4_with_Ta#63_on_NHC.jpg
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Attachment 1: 20220119_080049.jpg
20220119_080049.jpg
  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system

 The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.

 

Attachment 1: v10_v11.jpg
v10_v11.jpg
Attachment 2: v10.jpg
v10.jpg
Attachment 3: v11.jpg
v11.jpg
ELOG V2.9.2-2455