Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2293
Entry time:
Wednesday, January 19, 2022, 09:00
Author:
Frank Song
Category:
North Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
Ta #63
Subject:
Electrical check on TM4 at NHC without target
David did electrical check after target removed from TM4 at NHC. see attachment pls.
Attachment 1:
20220119_080049.jpg
4.005 MB
|
Show
|
Hide all
ELOG V2.9.2-2455