Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2245     Entry time: Friday, September 17, 2021, 12:20
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Sic#41 
Subject: TM4 SIS with Target and No external Connections 

 TM4 electric check with new target was done by David. A pic attached here for ref.

Attachment 1: IMG_3603.jpg  1.354 MB  | Show | Hide all
ELOG V2.9.2-2455