Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2275
Entry time:
Wednesday, November 24, 2021, 07:17
Author:
Frank Song
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
Ta #63
Subject:
TM4 SIS with Target and No external Connections
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David.
Attachment 1:
IMG_4469.JPG
194 kB
|
Show
|
Hide all
ELOG V2.9.2-2455