Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2275     Entry time: Wednesday, November 24, 2021, 07:17
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta #63 
Subject: TM4 SIS with Target and No external Connections 

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Attachment 1: IMG_4469.JPG  194 kB  | Show | Hide all
ELOG V2.9.2-2455