Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2291     Entry time: Monday, January 17, 2022, 10:44
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: UC#36 (the target removed) 
Subject: TM2 electrical check without Target. 

 An electric check was done right after module moving from SMP to SHC. 

Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg  2.763 MB  | Show | Hide all
ELOG V2.9.2-2455