2108
|
Friday, June 19, 2020, 11:21 |
David Wang | ITE | Repair | TM4 | P2N test. | ITE TP3 is replaced. | ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far. |
|
|
2113
|
Monday, June 29, 2020, 10:09 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | ITE turbo pumps are stopped | ITE venting is in processing. |
|
|
2088
|
Tuesday, March 17, 2020, 14:59 |
David Wang | ITE | Development | TM4 | P2N | ITE turbopumps are started. | They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. |
|
|
2086
|
Tuesday, March 17, 2020, 11:42 |
Travis Cave | ITE | Standard Operation | TM4 | P to N target | Module move | TM#4 with the P to N target has been
moved from the south hot cell to the east
target station. |
|
|
714
|
Thursday, July 24, 2014, 18:21 |
Grant Minor | South Hot-Cell | Repair | TM2 | No target / no source tray | Leak check on TM2 ionizer tube cooling lines C and D - module side | Target Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. |
|
|
858
|
Thursday, March 12, 2015, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no target and no source tray
has been moved from the conditioning station
to the north east silo. |
|
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
|
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 from south hot cell to the conditioning
station no target is attached to the module. |
|
|
868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 with no target has been moved
from conditioning station to the south hot
cell. |
|
|
887
|
Friday, April 17, 2015, 09:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | No target | Module move | TM#1 with no target has been moved from
the south west silo to the south hot cell
for the installation of the UCx target. |
|
|
906
|
Thursday, April 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no source tray has been moved
from the north east silo to the south hot
cell. |
|
|
911
|
Wednesday, May 06, 2015, 14:30 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 | Wires for TM#2 steering elements, and png
gauge have been run down to the containment
box level. Chad has placed them in the little |
|
|
912
|
Thursday, May 07, 2015, 11:02 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 | Wires in TM#2 have been terminated at the
top of the module. |
|
|
1584
|
Monday, July 17, 2017, 16:28 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | 50 kV stable with less than 1 spark/h during
the weekend by RIB obs.
Today 57 kV reached, but observed |
|
|
1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
|
1587
|
Tuesday, July 18, 2017, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS |
|
|
1842
|
Wednesday, December 19, 2018, 14:41 |
Anders Mjos | Conditioning Station | Standard Operation | | No target | Installed Shield Block on TCS | Frank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational |
|
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
|
1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
|
1939
|
Monday, June 10, 2019, 18:12 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Attempt to push bias > 56kV | Monday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After |
|