  RH-ISAC, Page 58 of 140  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  954   Friday, June 19, 2015, 11:52 David WangITEStandard OperationTM4SiC #315 Shielding blocks have been transferred from ITW to ITE.5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  411   Thursday, July 25, 2013, 10:08 David WangConditioning StationStandard OperationTM4SiC #29TM4 HS helium pressure test andTM4 connection at CSBevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec
  
  2772   Wednesday, February 19, 2025, 10:07 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Active trash was placed into an unmarked
pail and place in spot 7C of the vault the
pail measured 321uSv/hr when removed from
 Target_Index_2025-02-19.pdf 
  2778   Tuesday, February 25, 2025, 09:42 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Another pail of active trash was
move to the spent target vault from the south
hot cell. 800uSv/hr, place in spot 7A see
 Target_Index_2025-02-25.pdf 
  2107   Thursday, June 18, 2020, 13:25 David WangITEStandard OperationTM4P2N test.Disconnect TM4 in ITE.TM4 has been disconnected in ITE. Vacuum
pumps and gauge are not disconnected yet.
  
  2108   Friday, June 19, 2020, 11:21 David WangITERepairTM4P2N test.ITE TP3 is replaced.ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far.
  
  2113   Monday, June 29, 2020, 10:09 David WangITEStandard OperationTM4P2N test.ITE turbo pumps are stoppedITE venting is in processing.   
  2088   Tuesday, March 17, 2020, 14:59 David WangITEDevelopmentTM4P2NITE turbopumps are started.They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. 
  
  2086   Tuesday, March 17, 2020, 11:42 Travis CaveITEStandard OperationTM4P to N targetModule move TM#4 with the P to N target has been
moved from the south hot cell to the east
target station.
  
  714   Thursday, July 24, 2014, 18:21 Grant MinorSouth Hot-CellRepairTM2No target / no source trayLeak check on TM2 ionizer tube cooling lines C and D - module sideTarget Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. 
 ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpgTM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpgTM2_hot_cell_leak_check_no_source_tray_24july2014.JPG 
  858   Thursday, March 12, 2015, 09:48 Travis CaveSouth Hot-CellStandard OperationTM2No target Module moveTM#2 with no target and no source tray
has been moved from the conditioning station
to the north east silo.
  
  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage ConditioningWednesday, October 14, 2014
 The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped
 TCS_TM3.docx 
  863   Monday, March 16, 2015, 14:16 Travis CaveConditioning StationStandard OperationTM4No targetModule moveTM#4 from south hot cell to the conditioning
station no target is attached to the module.
  
  868   Tuesday, March 24, 2015, 08:46 Travis CaveConditioning StationStandard OperationTM4No targetModule moveTM#4  with no target has been moved
from conditioning station to the south hot
cell.
  
  887   Friday, April 17, 2015, 09:09 Travis CaveSouth Hot-CellStandard OperationTM1No targetModule moveTM#1 with no target has been moved from
the south west silo to the south hot cell
for the installation of the UCx target.
  
  906   Thursday, April 30, 2015, 08:50 Travis CaveSouth Hot-CellStandard OperationTM2No targetModule moveTM#2 with no source tray has been moved
from the north east silo to the south hot
cell.
  
  911   Wednesday, May 06, 2015, 14:30 Travis CaveSouth Hot-CellRepairTM2No targetWiring of TM#2Wires for TM#2 steering elements, and png
gauge have been run down to the containment
box level. Chad has placed them in the little
 Photo_2015-05-06_8_26_10_AM.JPGPhoto_2015-05-06_8_26_17_AM.JPG 
  912   Thursday, May 07, 2015, 11:02 Travis CaveSouth Hot-CellRepairTM2No targetWiring of TM#2Wires in TM#2 have been terminated at the
top of the module.
  
  1584   Monday, July 17, 2017, 16:28 Anders MjosConditioning StationDevelopmentTM3No targetConditioning TM350 kV stable with less than 1 spark/h during
the weekend by RIB obs.
Today 57 kV reached, but observed
 TM3_HV_conditioning_2017-07-17.docx 