Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2108     Entry time: Friday, June 19, 2020, 11:21
Author: David Wang 
Category: ITE 
Type: Repair 
Module: TM4 
Target/Number: P2N test. 
Subject: ITE TP3 is replaced. 

ITE TP3 is replaced. ITE is under vacuum again. All turbo pumps are started successfully. Current draw on pumps are normal so far.

ELOG V2.9.2-2455