Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2113     Entry time: Monday, June 29, 2020, 10:09
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: P2N test. 
Subject: ITE turbo pumps are stopped 

ITE venting is in processing.

ELOG V2.9.2-2455