Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2647     Entry time: Thursday, August 08, 2024, 11:41
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: SiC #46 
Subject: Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning. 

Tm3 was moved from ITE to TCS this Tuesday, then to SHC  this morning. Both moves are successful.

ELOG V2.9.2-2455