Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2088     Entry time: Tuesday, March 17, 2020, 14:59
Author: David Wang 
Category: ITE 
Type: Development 
Module: TM4 
Target/Number: P2N 
Subject: ITE turbopumps are started. 

They work fine. Current draw on all pumps are normal. I asked operator to switch on IG1 , IG1S and PNG4.

ELOG V2.9.2-2455