ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
818
|
Monday, December 08, 2014, 15:22 |
Anders Mjos | Conditioning Station | Development | TM2 | | Circuit D water test | Monday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover. |
   |
819
|
Monday, December 15, 2014, 08:50 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TK2 level below 15 in (secondary loop) | The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping. |
|
820
|
Monday, December 15, 2014, 09:41 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | Water leak found at the isolation transforer |
|
|
821
|
Monday, December 15, 2014, 12:53 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TCSTK2 topped up |
|
|
822
|
Monday, December 15, 2014, 13:25 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | BIASSW1 temperature and flow removed from interlock chain |
|
|
824
|
Tuesday, December 23, 2014, 14:10 |
Anders Mjos | Conditioning Station | Development | TM2 | | He leak check of the Service Cap using RGA | The RGA showed no response to He-spray
on the Service Cap. He stable at 3.5E-9 T
partial pressure, water at 1.3E-6 T. IG1 |
|
825
|
Monday, January 05, 2015, 12:47 |
Anders Mjos | Conditioning Station | Development | TM2 | | Cooling package started | by "enable staging" button.
MP3 has to be turned off-on to open WPV1 |
|
826
|
Monday, January 05, 2015, 15:01 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA switched on | |
|
828
|
Tuesday, January 06, 2015, 11:21 |
Anders Mjos | Conditioning Station | Development | TM2 | | He leak check of cooling circuits. | No leak detected on either He-detector
(connected directly to Service Cap) or on
RGA. See attached screen shots. |
|
829
|
Wednesday, January 07, 2015, 09:31 |
Anders Mjos | Conditioning Station | Development | TM2 | | High Voltage Conditioning | No Source Tray installed. Loop on cooling
circuit D. All other circuits blanked off.
Voltages stated below are set point |
|
832
|
Thursday, January 08, 2015, 15:24 |
Anders Mjos | Conditioning Station | Development | TM2 | | Fault 2 on chiller unit | Found both VFDs with OF3 fault (over
voltage during constant speed operation).
Thursday, January 08, 2015, 16:37: |
 |
833
|
Monday, January 12, 2015, 14:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build Status | Countersink problem with supports has been
remedied. Scratches, dings, and pitting has
been buffed out and supports re-cleaned and |
|
834
|
Tuesday, January 20, 2015, 13:45 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Alignment | TM2 Tray Alignment is complete except for
verification with alignment tray.
First attempt results were: |
 |
835
|
Monday, January 26, 2015, 09:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Alignment | TM2 tray alignment was confirmed with the
alignment tray this morning:
Front target 0.000 vertically, 0.000 |
|
836
|
Wednesday, January 28, 2015, 10:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TCS shut down for site wide power outage | |
|
837
|
Thursday, January 29, 2015, 11:31 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build | On Tuesday morning I attempted to complete
assembly of the source tray for TM2 however
discovered that 3 1/4-20 x 0.25 titanium |
|
838
|
Monday, February 02, 2015, 09:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray Build | Missing heli coils installed this morning.
Threads had to be chased with tap
for 1/4-20 heli coil and missing countersinks |
|
839
|
Monday, February 02, 2015, 14:06 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Tray build | Master target jig installed to locate attachment
bracket ITA3389 as well as conductor insulator
block b (aluminum / for soldering version) |
 |
858
|
Thursday, March 12, 2015, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no target and no source tray
has been moved from the conditioning station
to the north east silo. |
|
879
|
Tuesday, March 31, 2015, 11:36 |
chad fisher | South Hot-Cell | Development | TM2 | | TM2 Optics Tray Complete | TM2 optics tray is complete.
Master alignment tray: 0 up/down,
0 left/right |
  |