Entry  Friday, June 19, 2015, 11:52, David Wang, ITE, Standard Operation, TM4, SiC #31, 5 Shielding blocks have been transferred from ITW to ITE. 
5 shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Monday, July 07, 2014, 14:45, Grant Minor, ITE, Maintenance, TM3, SiC #30, FEBIAD gas line check ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg
There were some problems this morning with provision of FEBIAD gas to the the target at ITE.  It was suspected that the gas line was improperly
connected to the module, or that the valves at the module were not opened.
Remote Handling was asked to open the HV cover on TM3 at ITE and check the connection of the FEBIAD gas line.  Grant Minor, Maico Dalla Valle,
Entry  Thursday, July 25, 2013, 10:08, David Wang, Conditioning Station, Standard Operation, TM4, SiC #29, TM4 HS helium pressure test andTM4 connection at CS 
Bevan and I did a helium pressure test on TM4 HS water circuit at CS. The leak detector is pumped to the bottom scale(E-9 atm.cc/sec and E-4torr). We
applied 70 psi helium to the HS circuit for 3 minutes .  No response had been found. I also leak checked IG1 flange which was replaced yesterday.
It is  good. We connected the TM4 to CS and put the HV cover on. The water cooling system will be started soon.
Entry  Wednesday, February 19, 2025, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , SHC Active Trash, SHC Active Trash Target_Index_2025-02-19.pdf
 Active trash was placed into an unmarked pail and place in spot 7C of the vault the pail measured 321uSv/hr when removed from the SHC. See attached
PDF for details.
Entry  Tuesday, February 25, 2025, 09:42, Travis Cave, Spent Target Vault, Standard Operation, , SHC Active Trash, SHC Active Trash Target_Index_2025-02-25.pdf
 Another pail of active trash was move to the spent target vault from the south hot cell. 800uSv/hr, place in spot 7A see attached PDF for vault
status.
Entry  Thursday, June 18, 2020, 13:25, David Wang, ITE, Standard Operation, TM4, P2N test., Disconnect TM4 in ITE. 
TM4 has been disconnected in ITE. Vacuum pumps and gauge are not disconnected yet. 
Entry  Friday, June 19, 2020, 11:21, David Wang, ITE, Repair, TM4, P2N test., ITE TP3 is replaced. 
ITE TP3 is replaced. ITE is under vacuum again. All turbo pumps are started successfully. Current draw on pumps are normal so far. 
Entry  Monday, June 29, 2020, 10:09, David Wang, ITE, Standard Operation, TM4, P2N test., ITE turbo pumps are stopped 
ITE venting is in processing.
Entry  Tuesday, March 17, 2020, 14:59, David Wang, ITE, Development, TM4, P2N, ITE turbopumps are started. 
They work fine. Current draw on all pumps are normal. I asked operator to switch on IG1 , IG1S and PNG4. 
Entry  Tuesday, March 17, 2020, 11:42, Travis Cave, ITE, Standard Operation, TM4, P to N target, Module move 
 TM#4 with the P to N target has been moved from the south hot cell to the east target station.
Entry  Thursday, July 24, 2014, 18:21, Grant Minor, South Hot-Cell, Repair, TM2, No target / no source tray, Leak check on TM2 ionizer tube cooling lines C and D - module side ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpgTM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpgTM2_hot_cell_leak_check_no_source_tray_24july2014.JPG
Target Ionizer tube cooling lines "C" and "D" in Target Module 2 were both leak checked at the Hot Cell.  The lines were both
blanked-off.
Bill Paley was present with David Wang in the Target Hall, operating the leak detector.  Grant Minor and Anders Mjos were present with Chad
Entry  Thursday, March 12, 2015, 09:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, No target , Module move 
TM#2 with no target and no source tray has been moved from the conditioning station to the north east silo.
Entry  Tuesday, October 14, 2014, 17:19, Anders Mjos, Conditioning Station, Standard Operation, TM3, No target, High Voltage Conditioning TCS_TM3.docx
Wednesday, October 14, 2014
 The BIAS voltage was brought up between 1:30pm and 5pm. Sparks tripped the BIAS power supply at voltages between 20 - 24 kV. Multiple attempts
were made. The current was about 50-60 uA.
Entry  Monday, March 16, 2015, 14:16, Travis Cave, Conditioning Station, Standard Operation, TM4, No target, Module move 
TM#4 from south hot cell to the conditioning station no target is attached to the module.
Entry  Tuesday, March 24, 2015, 08:46, Travis Cave, Conditioning Station, Standard Operation, TM4, No target, Module move 
TM#4  with no target has been moved from conditioning station to the south hot cell.
Entry  Friday, April 17, 2015, 09:09, Travis Cave, South Hot-Cell, Standard Operation, TM1, No target, Module move 
TM#1 with no target has been moved from the south west silo to the south hot cell for the installation of the UCx target.
Entry  Thursday, April 30, 2015, 08:50, Travis Cave, South Hot-Cell, Standard Operation, TM2, No target, Module move 
TM#2 with no source tray has been moved from the north east silo to the south hot cell.
Entry  Wednesday, May 06, 2015, 14:30, Travis Cave, South Hot-Cell, Repair, TM2, No target, Wiring of TM#2 Photo_2015-05-06_8_26_10_AM.JPGPhoto_2015-05-06_8_26_17_AM.JPG
Wires for TM#2 steering elements, and png gauge have been run down to the containment box level. Chad has placed them in the little cable trays. Slack
has been pulled back. and termination of the wire will be done on the 7th of May. A modification was done to the signal line of the png gauge wire ultem
block, as grounded screw was inserted to allow for strain relief so the end would hopefully quit breaking. See attached pictures for the details.
Entry  Thursday, May 07, 2015, 11:02, Travis Cave, South Hot-Cell, Repair, TM2, No target, Wiring of TM#2 
Wires in TM#2 have been terminated at the top of the module.
Entry  Monday, July 17, 2017, 16:28, Anders Mjos, Conditioning Station, Development, TM3, No target, Conditioning TM3 TM3_HV_conditioning_2017-07-17.docx
50 kV stable with less than 1 spark/h during the weekend by RIB obs.
Today 57 kV reached, but observed sparking on the resistors of the new HV cable. The cable will be removed to take out the resistors, before reinstalling
it.