Thursday, August 08, 2024, 11:41, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning.
Thursday, August 08, 2024, 13:58, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, TM3 SiC#46 electrical check at SHC with target on (After operation)
Thursday, August 11, 2022, 09:10, David Wang, Conditioning Station, Standard Operation, TM4, SiC #44, HS line helium pressure test. Gas line fitting on module top and gas line leak check.
Thursday, March 05, 2020, 07:16, David Wang, South Hot-Cell, Standard Operation, TM2, SiC #39, TM2 SiC #39 post run electrical checklist
Friday, March 06, 2020, 09:35, David Wang, Spent Target Vault, Standard Operation, , SiC #39, Spent target SiC#39 removal from SHC to storage vault.
Tuesday, June 02, 2015, 14:32, David Wang, South Hot-Cell, Standard Operation, TM4, SiC #31, Leak check on TM4 HS water line with new SiC #31 target. at SHC
Tuesday, June 02, 2015, 14:39, David Wang, Conditioning Station, Standard Operation, TM4, SiC #31, TM4 and CS turbo- pumps are started .
Wednesday, June 03, 2015, 13:51, David Wang, Conditioning Station, Standard Operation, TM4, SiC #31, TM4 is connected at CS
Wednesday, June 10, 2015, 11:49, David Wang, ITE, Standard Operation, TM4, SiC #31, TM4 has been connected in ITE
Friday, June 19, 2015, 11:52, David Wang, ITE, Standard Operation, TM4, SiC #31, 5 Shielding blocks have been transferred from ITW to ITE.
Monday, July 07, 2014, 14:45, Grant Minor, ITE, Maintenance, TM3, SiC #30, FEBIAD gas line check
Thursday, July 25, 2013, 10:08, David Wang, Conditioning Station, Standard Operation, TM4, SiC #29, TM4 HS helium pressure test andTM4 connection at CS
Wednesday, February 19, 2025, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , SHC Active Trash, SHC Active Trash
Tuesday, February 25, 2025, 09:42, Travis Cave, Spent Target Vault, Standard Operation, , SHC Active Trash, SHC Active Trash
Thursday, June 18, 2020, 13:25, David Wang, ITE, Standard Operation, TM4, P2N test., Disconnect TM4 in ITE.
Friday, June 19, 2020, 11:21, David Wang, ITE, Repair, TM4, P2N test., ITE TP3 is replaced.
Monday, June 29, 2020, 10:09, David Wang, ITE, Standard Operation, TM4, P2N test., ITE turbo pumps are stopped
Tuesday, March 17, 2020, 14:59, David Wang, ITE, Development, TM4, P2N, ITE turbopumps are started.
Tuesday, March 17, 2020, 11:42, Travis Cave, ITE, Standard Operation, TM4, P to N target, Module move
Thursday, July 24, 2014, 18:21, Grant Minor, South Hot-Cell, Repair, TM2, No target / no source tray, Leak check on TM2 ionizer tube cooling lines C and D - module side