ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  803   Friday, November 28, 2014, 13:06 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 with no target or source tray has
been moved from the north east silo to the
south hot cell.
  
  805   Monday, December 01, 2014, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 REFURB. WATER LOOP TESTSome issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead
 TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg 
  807   Tuesday, December 02, 2014, 10:15 chad fisherSouth Hot-CellRepairTM2 TM2 Reburb. Loop InstallFinal polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90
 TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg 
  808   Tuesday, December 02, 2014, 13:33 David WangSouth Hot-CellDevelopmentTM2 Leak check on TM2 tube heater +(D) at SHCChad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The
 2014-12-02_003.JPG2014-12-02_001.JPG2014-12-02_004.JPG 
  809   Thursday, December 04, 2014, 09:49 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  810   Thursday, December 04, 2014, 09:54 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical checkResults of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results.
 TM2_elec_check_no_source_traySHC.PDF 
  812   Thursday, December 04, 2014, 16:37 David WangConditioning StationDevelopmentTM2 connected TM2 and CS vacuum system .I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far
  
  813   Friday, December 05, 2014, 07:47 David WangConditioning StationDevelopmentTM2 TM2 at CSThe pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec
  
  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied
 6x 
  815   Friday, December 05, 2014, 13:46 Anders MjosConditioning StationDevelopmentTM2 Not able to start water system TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed.
  
  816   Friday, December 05, 2014, 15:41 Anders MjosConditioning StationDevelopmentTM2 RGA resultsMeasurement taken at 14:25. IG2 at ~7.7E-6
T
 2014-12-05-14-25_TM2.png2014-12-05-14-25_TM2.txt 
  817   Monday, December 08, 2014, 13:52 Anders MjosConditioning StationDevelopmentTM2 Fixed - Not able to start water system

    

       
            
  
  818   Monday, December 08, 2014, 15:22 Anders MjosConditioning StationDevelopmentTM2 Circuit D water testMonday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover.
 TCS_Heater_Transmission_Power.xlsxCircuit_D_test_results_for_TM2_status_meeting_2014-12-11.pdfHeated_water_leak_test_plan.pdfHeated_water_leak_test_Circuit_D_RESULTS.docx 
  819   Monday, December 15, 2014, 08:50 Anders MjosConditioning StationMaintenanceTM2 TK2 level below 15 in (secondary loop) The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping.
  
  820   Monday, December 15, 2014, 09:41 Anders MjosConditioning StationMaintenanceTM2 Water leak found at the isolation transforer

    

       
            
  
  821   Monday, December 15, 2014, 12:53 Anders MjosConditioning StationMaintenanceTM2 TCSTK2 topped up

    

       
            
  
  822   Monday, December 15, 2014, 13:25 Anders MjosConditioning StationMaintenanceTM2 BIASSW1 temperature and flow removed from interlock chain

    

       
            
  
  824   Tuesday, December 23, 2014, 14:10 Anders MjosConditioning StationDevelopmentTM2 He leak check of the Service Cap using RGAThe RGA showed no response to He-spray
on the Service Cap. He stable at 3.5E-9 T
partial pressure, water at 1.3E-6 T. IG1
  
  825   Monday, January 05, 2015, 12:47 Anders MjosConditioning StationDevelopmentTM2 Cooling package started by "enable staging" button.
MP3 has to be turned off-on to open WPV1
  
  826   Monday, January 05, 2015, 15:01 Anders MjosConditioning StationDevelopmentTM2 RGA switched on    