  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE Silo

TM3 was moved from SHC to NE silo. Cable tray was recently installed.

  2555   Wednesday, March 27, 2024, 09:49 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved to SHC from silo.

Tm3 has been moved to SHC from silo. the move is smooth.

  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.

Tm3 has been moved  from SHC to silo. The move is smooth.

  2561   Thursday, April 11, 2024, 06:07 David WangSouth Hot-CellStandard OperationTM3 Tm3 was moved from silo to SHC yesterday.

Tm3 was moved from silo to SHC yesterday. the move is smooth.

  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday.

TM3 new source tray was transferred into SHC on this Tuesday. one hook arm of transfer jig is very close to optic tray tube when engaging the jig on transfer frame. tube side hook arm should go east side a little bit further to avoid the tube.  Also the HS tube top lines to  transfer frame beam bottom distance needs to be watched closely when hooking on the frame.Help from HC window is necessary. By watching on this details, Source tray are successfully moved into SHC with crane controlled locally in TH.Transfer frame was retrieved back to TH. It was cleaned, bagged and stored in TH.

  2565   Friday, April 19, 2024, 10:44 David WangSouth Hot-CellDevelopmentTM3 TM3 water lines helium spray leak check at SHC.

TM3 water lines helium spray leak check at SHC is done. No leak has been found on all lines. seeattachment

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf Scanned_from_a_Xerox_Multifunction_Printer_(7).pdf
  2566   Tuesday, April 23, 2024, 17:34 Carla BabcockSouth Hot-CellRepairTM3 TM3 wire pulling

Wires were pulled in TM3 and service cap was closed up again:

Einzel lens wire (30kV kapton), routed in the pumping duct and attached with #10 ring tongue to EZL feedthrough in service cap

4 steerer wires, routed in th pumping duct and attached with push on connectors to the 4 SHV feedthroughs on the module side panel. Coax grounding sheath is cut back by about 3cm.

Multipin cable bundle #1, routed through the left cable tube in the service tray then along the heat shield water lines (with PEEK zip ties) to feedthrough A.

Multipin cable bundle #2, routed through the right cable tube in the service tray then along the heat shield water lines (with PEEK zip ties) to feedthrough B. This bundle contains the EE wire as well, which was branched out after exiting the service tray and routed along the gas lines to the EE feedthough. It was attached with a smaller (size?) ring tongue to the EE feedthrough. Do not use this wire again, very fragile. Use the Accuglass 30kV wire instead.

 

The multipin wires touch the back of the water blocks in the source tray (same as in MT2/4, so far no issues with that) and they also touch the COIL lines in the service cap.

The EZL and steerer wires are routed along the floor of the service cap.

Due to the difficulty of the installation, there is no metal braid over the multipin bundles in the service cap.

Photos here : https://triumfoffice365-my.sharepoint.com/:f:/g/personal/cbabcock_triumf_ca/EslWNUST-UJKh1s8jjxWG6EBpLQEnWxgV4v-NvR4ZJjlOQ?e=Mw5vvI

  2567   Wednesday, April 24, 2024, 10:15 David WangConditioning StationStandard OperationTM3 TM3 has been moved from SHC to TCS.

TM3 has been moved  from SHC to TCS. The move is smooth.

  2568   Friday, April 26, 2024, 08:56 David WangConditioning StationDevelopmentTM3 TM3 module top helium spray leak test.

TM3 module top helium spray leak test was done yesterday.  No leak on TM3 module top @ LD base leak rate 0.0 x E-9 atm.cc/sec.

  2569   Friday, April 26, 2024, 08:59 David WangConditioning StationDevelopmentTM3 TM3 helium pressure test and electrical check with new source tray at TCS.

TM3 helium pressure test and electrical check with new source tray at TCS were done yesterday. The results are excellent. See attachment

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(9).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(9).pdf Scanned_from_a_Xerox_Multifunction_Printer_(9).pdf
  2571   Saturday, April 27, 2024, 09:35 Carla Babcock; Alexander ShkuratoffConditioning StationDevelopmentTM3 TM3 source and service tray testing

Saturday, April 27, 2024, 09:35 :

Started ramping up HV, EE and EL together. First small spark at 20.5kV on bias, no reaction in other devices.

Note both BIAS and EL are off in their readbacks. See table below

BIAS set pt BIAS readback BIAS actual EL set pt EL readback EL actual
24 24.4 24.5 14 13.42 14
30 30.52 31 16 15.34 16
35 35.6 36 19 18.2 19
40 40.65 41.5 20 19.16 20
45 45.8 46.5 22 21 22
50 50.8 51.5 25 23.9 25
55 55.9 57 27 25.84 27
60 60.95 62.5 30 28.7  
62  63  64.5      
66 67.1 68.5      
67 68  69.5      
69 70.1 71.5      
70 71.1 ??      
70.5 71.7 73      

Saturday, April 27, 2024, 10:23 :

Spark on HV only at 25.5, couple sparks from here to 33, then at 33 starts real conditioning.

EL is reacting to some of the sparks, not sure if this is just electrical noise or not.

Saturday, April 27, 2024, 18:14 :

lots of trips above 60kV on the set pt. tripping off turbos and gauges. IG2 needed the controller reset.

 

RESULT: Got to 64.5 (actual) 62 (set point) with quite a bit of sparking over 60kV. Will go the rest of the way to 73 in the next days. Data dumped as isac/data/TM3_HVtests_Apr272024.dat

 

Sunday, April 28, 2024, 11:23 :

Ramped back up to 60kV reasonably easily, couple sparks and turbo trips.

Went up to 64kV (set point) with a lot of difficulty. Data dumped as isac/data/TM3_HVtests_Apr282024.dat

 

Monday, April 29, 2024, 14:58 :

Ramped up to set pt 62 easily, went down to 500V then 100V steps after that.

Went to set pt of 67 and left it there for ~40mins. Not perfectly stable but not too bad.

 

Tuesday, April 30, 2024, 17:12 :

After rebooting the TCS PLC to fix all the non-responsive devices, everything is working fine again.

Ramped easily to 60kV in 1kV steps.

Still got to 67 without too much trouble. Behaving pretty well...

At 70.2 (set pt, 71.3 readback) the water and vacuum gauge both tripped off and cannot be restarted. I am not sure what the real power supply reading is here but in the past it has been 70.5 set pt = 73 real value, which is as high as the power supply goes.

Stopping here since I'm not sure the water is circulating... the off pump says it is and the on pump says its not... left it at 70.2 for 40mins, still sparking going on (20:28 to 21:10)

Data dumped as isac/data/TM3_HVtests_Apr302024.dat

 

Sunday, May 05, 2024, 10:50 :

Containment box and target installed.

HV conditioning starting at 47kV.

Spark at 58kV knocked out IG1. Continuing with IG2 and IG1S.

Went up to set point of 63, readback 64. Will continue on Monday.

Data dumped: isac/data/TM3_HVtests_May52024.dat

 

Monday, May 06, 2024, 09:37 :

Ramping system back up.

First sparks at 50kv while raising the EL voltage (not sure if they are related).

AS: Voltage quickly up to 63 kV from 49 kV. Very smooth, no sparks or instabilities. Ramped at around 250 V steps every 10-20 seconds. First signs of instability at ~62.75 kV and definitely at 63 kV. I guess this is where it was conditioned to last. Let sit at 63 kV for a while while doing something else. It sparked once and turned off a turbo after half an hour. Starting ramping again.

AS: Spark at 65.75 kV killed IG1. Carla manually reset at 69 kV. Still working. A spark at 70.25 kV took out IG1 again.

AS: Maximum voltage reached at about 16:45. Setpoint 70.5 kV, readback 71.7 kV, PS itself ~73 kV. Carla reset IG1.

AS: 18:30, spent about 1.5 hours cumulatively at this maximum voltage. During this time it sparked about 15 times. Not long enough to tell if the spark frequency is decreasing. In the middle of this, Carla did something accidentally and caused the voltage to drop a bunch, so I manually set it to 0 V. She then reset TP1S, which was not staying on. Also, the EE and EL stayed at their respective voltages during this downtime (2 kV and 28.7 kV). I ramped the main BIAS voltage back up to the maximum voltage within 5 minutes and it was smooth all the way but sparked again at the maximum voltage. It seems conditioned up to or near the max voltage. Ramped down and turned off BIAS, EL, and EE.

AS: Dumped data to isac/data/TM3_HVtests_May62024_Alexander.dat

 

Tuesday, May 07, 2024, 10:02 :

Tested the EE - ramped up easily to 7kV, but then had issues maintaining the voltage. No vacuum response. Ramped down since we never use it that high anyway, though cable should be good for 10kV. More investigations later.

 

EDIT 2024-11-25, Alexander Shkuratoff:

Summary of StripTool data taken during this round of tests:

[   ] TM3_HVtests_Apr272024.dat 2024-04-27 18:56 12M
[   ] TM3_HVtests_Apr282024.dat 2024-04-28 13:16 1.4M
[   ] TM3_HVtests_Apr302024.dat 2024-04-30 21:11 9.0M
[   ] TM3_HVtests_May52024.dat 2024-05-05 13:06 5.0M
[   ] TM3_HVtests_May62024_Alexander.dat 2024-05-06 18:45 9.5M

 

  2576   Wednesday, May 01, 2024, 14:51 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved form TCS to SHC.

Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth.

  2578   Thursday, May 02, 2024, 14:54 David WangConditioning StationStandard OperationTM3UCx#44TM3 has been moved from SHC to TCS.

TM3 has been moved  from SHC to TCS by David and Frank. The move is smooth.

  2579   Thursday, May 02, 2024, 14:58 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 with UCx#44 electrical check and leak check.

TM3 with UCx#44 electrical check and leak check are good. see attachment.

HS line 70 psi helium pressure test at TCS: no leak at 0.0xe-9 torr.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf
  2580   Thursday, May 02, 2024, 15:23 David WangSouth Hot-CellDevelopmentTM3 Leak check on TM3 new containment box window line VCR fittings.

After new containment box installation on TM3, Chad and I did a helium spray leak check on two VCR fittings on front side water lines. they are leak free.

Helium pressurize window water line to 70 psi for 3minutes. No response on leak detector which is 0.0xe-9 atm.cc/sec.

  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.

TCS was argon vented this morning between 7:00 to 8:30 am before module was moved to ITE.

  2586   Wednesday, May 08, 2024, 12:37 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form TCS to ITE

The move is smooth and successful.

  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE.

Tm3 has been connected in ITE.  see attachment.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf Scanned_from_a_Xerox_Multifunction_Printer.pdf
  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITE

Tuesday, May 14, 2024, 10:26 :

Ramping up bias/EE/EL on ITE - will see if the HV cage in the pit can hold 60kV or not.

At around 50kV the bias read current starts to get jumpy. Doesn't look like its an issue for the voltage, but definitely instability increases.

Screenshot_from_2024-05-14_10-47-22.png

Occasional sparks seem to increase the EL current significantly...

David heard some sparks in the target hall. Looks like from heat shield feed through to the top of the cage. Several sparks heard in the TH also changed the einzel lens draw current significantly. These feethroughs are not far from each other so could be related.

Apparently the sparking also tripped off all the optics and heaters in ITW, by changing the state of the water flow interlock. Interesting and not seen ever before. Will test again with the cage off, rather than risk tripping ITW again.

Tried ramping up the voltage on just the EE. Seems the limit is 7kV - at that level it gets sparky and unstable. Should be investigated (should hold 10kV) but not critical for module function.

 

Wednesday, May 15, 2024, 10:05 :

HV cover was removed this morning and the MAA was locked out.

Started ramping things up, was very easy until around 58kV. At 59.5kV a spark tripped off the EL. Canbus controller had to be power cycled to fix it. Bias current is much more stable in this configuration.

Ramped up again while listening from the TH to see if it was sparking outside. Went slowly to 60kV (left EL at 29kV) and didn't see any outside sparks in the first 10 mins, couple sparks in vacuum. But after 15 mins a spark seems to have fried the EL canbus card. We were not in the TH so not sure if it was on the outside or not.

After 2 hours a spark tripped off both ITE and ITW. Looks like it makes a water interlock go bad momentarily, but after the trip the interlocks seem fine.

 

Tuesday, May 28, 2024, 16:41

Running TM3 at any voltage in ITE produces fairly destructive sparks. There are not many but so far they have tripped off all optics in ITW, the water flow interlocks (later forced on to prevent this), the EL (generally comes back but killed the canbus card once), destroyed two vacuum gauge controllers, and may have contributed to the cathode short on ITE-TM3-UC44-LP-FEBIAD.

The conditioning process seems to go as planned, but the occassional inevitable spark still trips things, which is making it difficult to run stable.

Will continue with regular HV conditioning to see if this helps. Control over the current limit on the ITE:BIAS supply would also help, but seems a complicated thing to add according to Roberto.

 

TM3 sat fine at 53kV overnight and at 58kV for several hours. The EZL trips off maybe once every 2-3hrs or so, which is not ideal but liveable. This was with the TGHT and CHT power supplies forced, so not sure if we would know if they would have tripped...

 

CONCLUSIONS:

  1. TM3 has been commissioned for beam delivery after one week of delivery of UF to TITAN using a FEBIAD ion source in anode bias mode. Cathode mode was also used, so all functionality of the target except IGLIS current/voltage delivery through the mutlipin has been tested successfully.
  2. TM3 still requires commissioning at high voltage with protons to be considered fully commissioned, this will be done July 2 2024 due to problems with the cyclotron.

 

  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer

 the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.

submitted WP# I2024-05-22--1

actived  WP # I2024-05-23-4