Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2561     Entry time: Thursday, April 11, 2024, 06:07
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Tm3 was moved from silo to SHC yesterday. 

Tm3 was moved from silo to SHC yesterday. the move is smooth.

ELOG V2.9.2-2455