Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2209     Entry time: Wednesday, April 21, 2021, 10:32
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Remotely remove TM3 from SHC to silo 

On 2021-04-19, Frank and I remotely removed Tm3 from SHC to silo . The moving is successful.

ELOG V2.9.2-2455