Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2209
Entry time:
Wednesday, April 21, 2021, 10:32
Author:
David Wang
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM3
Target/Number:
Subject:
Remotely remove TM3 from SHC to silo
On 2021-04-19, Frank and I remotely removed Tm3 from SHC to silo . The moving is successful.
ELOG V2.9.2-2455