1965
|
Friday, August 16, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM4 | ZrC #8. | TM2 has been connected in ITE. | TM2 has been connected in ITE. turbo pumps
have been started. ITE and TM2 vacuum
are good. |
|
2003
|
Monday, October 07, 2019, 14:03 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | TM2 has been connected in ITE. | Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist |
|
2000
|
Friday, October 04, 2019, 16:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS. | TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. |
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS | I connected TM2 to TCS and started water
system. |
|
1571
|
Wednesday, June 28, 2017, 10:00 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#52 | TM2 has been connected at TCS | I started TCS water system. |
|
1657
|
Thursday, November 09, 2017, 09:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | TM2 has been connected at TCS | TCS vacuum system and water system have
been started as well. Everything looks fine. |
|
1343
|
Tuesday, August 30, 2016, 13:17 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | ITW turbo pumps have been
started. |
|
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | All turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far. |
|
1059
|
Tuesday, September 01, 2015, 14:54 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connectec in ITW. | TM2 has been connected in ITW. During the
connection, Anders and I found the
TM2 high current cables used in ITE |
|
1168
|
Thursday, March 17, 2016, 14:57 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 first round leak check in SHC | Chad and I finished the first round check
on Tm2 water lines. The lines and spots
checked are: Target oven + and - (front side |
|
1968
|
Friday, August 16, 2019, 14:23 |
Carla Babcock | ITE | Repair | TM2 | ZrC#8 | TM2 electrical checks in ITE | Ramped voltage on TM2 up to 30kV with no
problems. Bias current is at 29uA, same as
original TM2 bias current (see archiver for |
|
2291
|
Monday, January 17, 2022, 10:44 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 (the target removed) | TM2 electrical check without Target. | An electric check was done right
after module moving from SMP to SHC. |
|
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo | TM2 with no target on SW silo be
electrical checked right after module moving. |
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections | A standard electrical check was done
for TM2 after the short issue be fixed. |
|
1425
|
Tuesday, January 24, 2017, 15:24 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 electrical check and leack check. | I did electrical check before and after
Fefiad target installation on TM2. The RU
(coil) Is till short to 60KV as before. Other |
|
2156
|
Monday, October 19, 2020, 12:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#2 | TM2 electrical and leak check at SHC | TM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good. |
|
995
|
Tuesday, July 14, 2015, 12:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box removed | Containment box was removed from Tm2 this
morning in preparation for installation
of coil line and all the trimmings. |
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
1625
|
Friday, September 22, 2017, 14:15 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box off | TM2 containment box has been removed. Found
a piece of capton tape or tubing under table
(see picture). |
|
2226
|
Wednesday, June 09, 2021, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 containment box leak check. | Chad installed containment box back to
TM2 yesterday. We leak checked VCR joints
on window line. No leak. |
|