Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2003     Entry time: Monday, October 07, 2019, 14:03
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta 59 
Subject: TM2 has been connected in ITE. 

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Attachment 1: Ta_59_TM2_ITE__connection_checklist..pdf  433 kB  | Show | Hide all
ELOG V2.9.2-2455