Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2226     Entry time: Wednesday, June 09, 2021, 10:48
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: TM2 containment box leak check.  

Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line.    No leak.

ELOG V2.9.2-2455