1541
|
Thursday, May 18, 2017, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 TP1 at TCS | TM4 TP1 was found making some noise during
operation this morning. The current draw
was check then. It was 1.8 A which is higher |
|
1545
|
Friday, May 19, 2017, 13:49 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 TP1 at TCS | TM4 TP1 is replaced. TCS and TM4 was argon
vented before the job.The job took about
30minutes. I started the all turbo |
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
1460
|
Thursday, March 23, 2017, 11:42 |
David Wang | Conditioning Station | Maintenance | TM4 | | TM4 Sevice cap rust are cleaned out. | TM4 service cap rust are cleaned out at
TCS. All top surface of TM4 are wiped and
cleaned . The module looks good now. see |
    |
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | the TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. |
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | electric check done in ITE. |
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached |
|
2089
|
Wednesday, March 18, 2020, 10:40 |
David Wang | ITE | Development | TM4 | | TM4 P2N target connection checklist. | TM4 has been connected in ITE. See checklist. |
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
172
|
Friday, September 07, 2012, 08:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | NiO #1 | TM4 NiO #1 target heat shield helium pressure check is done. | leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr |
|
2395
|
Tuesday, November 29, 2022, 11:03 |
Adam Newsome | ITE | Standard Operation | TM4 | C#4 | TM4 Move - TCS to ITE | TM4 was moved from the Conditioning Station
to the East Target Station with C#4. |
|
2393
|
Wednesday, November 23, 2022, 12:10 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | UCx#41 | TM4 Move - NHC to TCS | TM4 was moved from the North Hot Cell to
the Target Conditioning Station with UCx#41.
|
|
2389
|
Tuesday, November 22, 2022, 10:37 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | | TM4 Move - ITE to NHC | TM4 was moved from ITE to NHC with C#4.
|
|
1952
|
Monday, July 22, 2019, 14:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target. |
|
1957
|
Wednesday, July 31, 2019, 08:57 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
|
|
1974
|
Tuesday, September 03, 2019, 10:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot-Cell. |
|
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move | TM4 with UCx#27 target has been moved from
the South Hot-Cell to the Conditioning Station.
|
|
1982
|
Tuesday, September 10, 2019, 10:10 |
Adam Newsome | ITW | Standard Operation | TM4 | UC#27 | TM4 Move | TM4 has been moved from the Conditioning
Station to ITW with UC#27 target. |
|
2009
|
Tuesday, October 22, 2019, 11:19 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UC# 28 | TM4 Move | TM4 with UC# 28 target has been moved from
ITW to the South Hot Cell. Shield plug installed
in ITW. |
|