Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2151     Entry time: Tuesday, September 29, 2020, 14:28
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#31 
Subject: TM4 UC#31 Electrical check and HS leak check 

Tm4 UCx 31# electrical check result. See attachment.

Attachment 1: TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf  160 kB  | Show | Hide all
Attachment 2: Scanned_from_a_Xerox_Multifunction_Printer.pdf  156 kB  Uploaded Thursday, October 08, 2020, 11:41  | Show | Hide all
ELOG V2.9.2-2455