Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 8     Entry time: Tuesday, July 19, 2011, 12:25
Author: maicodallavalle 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta36 
Subject: TM4 Ta36 Target was put into the south hot cell. 

Ta36 was check by Maico and Chad.It was then carried into the anteroom.From the anteroom it was transferred into the south hot cell.

ELOG V2.9.2-2455