Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2011     Entry time: Wednesday, October 23, 2019, 06:56
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM4 
Target/Number: UCX 28 
Subject: TM4 UCx 28 disconnection checklist 

TM4 was disconnected in ITW.  See checklist.

Attachment 1: UCx_28_disonnection_CL.pdf  380 kB  | Show | Hide all
ELOG V2.9.2-2455