Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2089     Entry time: Wednesday, March 18, 2020, 10:40
Author: David Wang 
Category: ITE 
Type: Development 
Module: TM4 
Target/Number:  
Subject: TM4 P2N target connection checklist. 

TM4 has been connected in ITE. See checklist.

Attachment 1: P2N_TM4_connection_checklist.pdf  574 kB  | Show | Hide all
ELOG V2.9.2-2455