Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 40 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Datedown Author Category Type Module Target/Number Subject
  2038   Thursday, January 02, 2020, 09:55 David WangCoolingStandard Operation  I turned on HALC water pump MP2.

HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be monitored for a while.

LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now.

  2037   Thursday, December 12, 2019, 14:39 Isaac EarleSafe Module ParkingDevelopment  SMP assembly shifted 1.0" north

The SMP assembly was shifted approximately 1.0" north today by pushing it, braced against the south wall, using a 100 Ton capacity air lifting bag supplied by Beamlines Group.  The move was one of the action items identified at the Gate 4A/4B close-out review.  During commissioning of the SMP, TM3 was installed into the vacuum vessel, which required the crane to be all the way at its south limit, so the move is to provide some margin for future use, particularly if TM1 is put in the SMP as the extent of its shielding is slightly larger than the other modules.

 

One of the air fittings for the lid actuation cylinder on the north side was damaged during the move.  It was replaced and correct functionality of lid actuation was then confirmed.

  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4B
SiC#38 in Pail 205 was moved to section 4B of the storage vault. Dose rate when retrieving from Hot Cell was 22.2 mSv/h.
Attachment 1: Target_Index_2019-12-03.pdf
Target_Index_2019-12-03.pdf
  2035   Friday, November 29, 2019, 13:10 David WangITEStandard OperationTM2SiC 39# febiadTM2 SiC#39 connection check list.

TM2 has been connected  in ITE.  All turbo-pumps are started.

Attachment 1: SiC_#_39_febiad_connection_checklist.pdf
SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf SiC_#_39_febiad_connection_checklist.pdf
  2034   Friday, November 29, 2019, 11:03 Travis CaveSouth Hot-CellStandard OperationTM2SiC#39Module move

 TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station.

  2033   Friday, November 29, 2019, 11:02 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38 SiC#39Electrical Check

 Results from the electrical check with the old SiC#38 target and the new SiC#39.

Attachment 1: Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf
Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf
Attachment 2: Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
  2032   Wednesday, November 27, 2019, 13:46 David WangConditioning StationStandard OperationTM2SiC 38# febiadTM2 SiC #38 disconnection checklist.

TM2 was disconnected in ITE yesterday.

Attachment 1: SiC_#_38_febiad_disconnection_checklist.pdf
SiC_#_38_febiad_disconnection_checklist.pdf SiC_#_38_febiad_disconnection_checklist.pdf SiC_#_38_febiad_disconnection_checklist.pdf
  2031   Tuesday, November 26, 2019, 10:24 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38Module move

 TM#2 with SiC#38 has been moved from ITE to the south hot cell.

  2030   Tuesday, November 19, 2019, 13:41 David WangITEStandard OperationTM2SiC 38# febiadTM2 SiC#38 connection check list.

TM2 was connected in ITE 12th Nov. attach checklist

Attachment 1: SiC_#_38_febiad_connection_checklist.pdf
SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged

 The targets UC#22,23,24 have been repackaged into the newer stronger pails, and have been placed back in the mini vault with new numbers. See attached PDF for details.

Attachment 1: Target_Index_2019-11-14_Mini_Vault.pdf
Target_Index_2019-11-14_Mini_Vault.pdf Target_Index_2019-11-14_Mini_Vault.pdf
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move

 The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details.

Attachment 1: Target_Index_2019-11-08.pdf
Target_Index_2019-11-08.pdf Target_Index_2019-11-08.pdf
  2027   Tuesday, November 12, 2019, 10:02 Adam NewsomeITEStandard OperationTM2SiC#38TM2 Move

TM2 was moved from the Conditioning Station to ITE, with SiC#38 target.

  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38

Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.


Tuesday, November 12, 2019

The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with TGHT=580A, TBHT=300A, ANODE=200V,150 mA, COIL=50A. Bias was conditioned to 30 kV

Attachment 1: SiC#38_ANODE_bias_2019-11-07.PNG
SiC#38_ANODE_bias_2019-11-07.PNG
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.

Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today.

  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 Results of the electrical check of TM#2 with the old Ta#59 target and target free.

Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
  2023   Tuesday, November 05, 2019, 12:46 chad fisherSouth Hot-CellStandard OperationTM2ta#59Ta#59 removed

Ta#59 has been removed from TM2 and it is now ready for electrical check.

  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklist

See attachment

Attachment 1: Ta#59_disconnection_checklist.pdf
Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf
  2021   Tuesday, November 05, 2019, 10:19 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Module move

 TM#2 with Ta#59 has been moved from the ITE to the south hot cell.

  2020   Thursday, October 31, 2019, 10:17 David WangAssembly/Bench TestMaintenanceTM2 Febiad target gas line leak check.

Feibiad gas line for ITE and its adapter fittings for TM2 are tested today by installing them on a dummy water stem. No leak on VCO fitting, adapter o-rings, and all Swagelock fittings of this assembly. Manual valve on gas line works fine.  The positional check on gas line between TM2 and ITW will be fulfilled next Tuesday during module disconnection. 

  2019   Thursday, October 31, 2019, 08:49 Anders MjosConditioning StationRepair  Water leak on non-active cooling water circuit

Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.

A fault reportt has been submitted to mechanical services - awaiting response.


Friday, November 01, 2019

Leak repaired by Mechanical Services. A brass fitting had cracked and was replaced with a galvanized fitting.

ELOG V2.9.2-2455