Thursday, November 07, 2019, 08:56, David Wang, Conditioning Station, Standard Operation, TM2, SiC#38, TM2 in TCS.
|
Thursday, November 07, 2019, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#38, Conditioing SiC#38
|
|
Message ID: 2025
Entry time: Thursday, November 07, 2019, 08:56
Reply to this: 2026
|
Author: |
David Wang |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM2 |
Target/Number: |
SiC#38 |
Subject: |
TM2 in TCS. |
|
|
Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today. |