Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2024     Entry time: Tuesday, November 05, 2019, 14:27
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#59 
Subject: Electrical Check 

 Results of the electrical check of TM#2 with the old Ta#59 target and target free.

Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf  158 kB  | Show | Hide all
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf  206 kB  | Show | Hide all
ELOG V2.9.2-2455