Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2033     Entry time: Friday, November 29, 2019, 11:02
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#38 SiC#39 
Subject: Electrical Check 

 Results from the electrical check with the old SiC#38 target and the new SiC#39.

Attachment 1: Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf  119 kB  | Show | Hide all
Attachment 2: Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf  152 kB  | Show | Hide all
ELOG V2.9.2-2455