Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2038     Entry time: Thursday, January 02, 2020, 09:55
Author: David Wang 
Category: Cooling 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: I turned on HALC water pump MP2. 

HALCW MP2 is switched onnow. There is a small amount of air trapped in system. The pump works fine.  Water level and system resistivity will be monitored for a while.

LALCW P5 and P6 are switched on  for cooling HALCW.  HALCW MP2 is in operation now.

ELOG V2.9.2-2455