Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2036
Entry time:
Tuesday, December 03, 2019, 12:45
Author:
Adam Newsome
Category:
Spent Target Vault
Type:
Standard Operation
Module:
Target/Number:
SiC#38
Subject:
SiC#38 in Pail 205 moved to Storage Vault: 4B
SiC#38 in Pail 205 was moved to section 4B of the storage vault. Dose rate when retrieving from Hot Cell was 22.2 mSv/h.
Attachment 1:
Target_Index_2019-12-03.pdf
83 kB
|
Show
|
Hide all
ELOG V2.9.2-2455