Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2030     Entry time: Tuesday, November 19, 2019, 13:41
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC 38# febiad 
Subject: TM2 SiC#38 connection check list. 

TM2 was connected in ITE 12th Nov. attach checklist

Attachment 1: SiC_#_38_febiad_connection_checklist.pdf  501 kB  | Show | Hide all
ELOG V2.9.2-2455