2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving. |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
2691
|
Tuesday, September 24, 2024, 09:37 |
Frank Song | ITE/ITW | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITE to ITW. |
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer | 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving. |
|
2719
|
Thursday, November 21, 2024, 14:11 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UCx#46 | shielding blocks transfer | Shielding blocks have been moved
from ITE to ITW and MAA is secured. |
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer | 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving. |
|
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving | Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations |
|
520
|
Tuesday, October 22, 2013, 17:07 |
Bevan Moss | Conditioning Station | Standard Operation | | | services shut down | The turbo pump, roughing pump, have
been turned off and the valves for venting
opened. The cooling package has also been |
|
928
|
Tuesday, June 02, 2015, 14:38 |
David Wang | Conditioning Station | Repair | TM4 | | replace broken TM4 IG1 | TM4 IG1 filament was broken during
last run at ITE. The broken filament
is replaced with a new one today when TM4 |
 |
1614
|
Wednesday, September 13, 2017, 16:05 |
David Wang | Conditioning Station | Repair | TM3 | | remove Tm3 service tray cover plate | TM3 service tray cover plate has been removed.
It is bagged and placed to TH b2 level south
wall beside the silo. |
|
2789
|
Friday, April 11, 2025, 13:34 |
chad fisher | North Hot-Cell | Repair | | | remote end 9342 installed | On March 27 remote end 9342 was installed
on the west position (right hand as viewed
by operator) and arm 9**4 removed and moved |
|
2605
|
Wednesday, June 05, 2024, 11:25 |
David Wang | Conditioning Station | Standard Operation | | | refilled TCS:TK2 to 27.4 inches. | refilled TCS:TK2 to 27.4 inches to compensate
water lost during THC filters change. |
|
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both |
10x |
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did the pressure test on TM2tube
heater+(D) water line at SHC with shop
air.We tested from 30psi to 80psi on both |
|
599
|
Thursday, February 13, 2014, 14:15 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
|
  |
2549
|
Wednesday, March 13, 2024, 11:12 |
Keith C Ng | Assembly/Bench Test | Repair | TM3 | | optics tray for tm3 | Alignment notes attached for the optics
tray for the refurbished tm3 with the new
service and source tray. |
|
1793
|
Tuesday, September 25, 2018, 08:01 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | nSiC#1 install | On September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot |
 |
2332
|
Tuesday, June 21, 2022, 15:36 |
Matthew Gareau | North Hot-Cell | Repair | TM2 | SiC#42, SiC#43 | multipin guide pin issues | While removing the SiC#42
it became apparent that the multipin guide |
|
1334
|
Wednesday, August 24, 2016, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#49 | module moved and electrical check | TM#2 with Ta#49 has had its electrical
check and was moved to the conditioning station.
see the attached pdf for the electrical check |
|
75
|
Monday, March 12, 2012, 11:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the south hot
cell to the north east silo, move went well. |
|