Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2645     Entry time: Wednesday, July 24, 2024, 10:10
Author: Frank Song 
Category: ITE/ITW/Storage Area 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: shielding blocks transfer 

 5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving.

ELOG V2.9.2-2455