Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2719     Entry time: Thursday, November 21, 2024, 14:11
Author: Frank Song 
Category: 5 Shielding Blocks 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#46 
Subject: shielding blocks transfer 

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

ELOG V2.9.2-2455