  2645   Wednesday, July 24, 2024, 10:10 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer

 5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving.

  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer

 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.

  2691   Tuesday, September 24, 2024, 09:37 Frank SongITE/ITWStandard Operation  shielding blocks transfer

 5 shielding blocks have been moved from ITE to ITW.

  2706   Tuesday, October 15, 2024, 12:57 Frank SongITW/ITEStandard Operation  shielding blocks transfer

 5 shielding blocks are transferred from ITW to ITE, Target Area is secured again after moving.

  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .

  520   Tuesday, October 22, 2013, 17:07 Bevan MossConditioning StationStandard Operation  services shut down

 The turbo pump, roughing pump, have been turned off and the valves for venting opened. The cooling package has also been turned off.

  928   Tuesday, June 02, 2015, 14:38 David WangConditioning StationRepairTM4 replace broken TM4 IG1

 TM4 IG1 filament was broken during last run  at ITE.  The broken filament is replaced with a new one today when TM4 is located at CS.

2015-06-03 , Leak checked the new 25 conflat gasket today. No leak. See attachments

Attachment 1: 002.JPG
002.JPG
Attachment 2: 006.JPG
006.JPG
  1614   Wednesday, September 13, 2017, 16:05 David WangConditioning StationRepairTM3 remove Tm3 service tray cover plate

TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo.

  2789   Friday, April 11, 2025, 13:34 chad fisherNorth Hot-CellRepair  remote end 9342 installed

On March 27 remote end 9342 was installed on the west position (right hand as viewed by operator) and arm 9**4 removed and moved to anteroom.

Previous to this installation, arm 9342 received tensioning of the elevation twist pulley block and tightening of the tong cable opening via the tong cable drum. Tong opening was reduced to roughly 2" to achieve tension in the tong cable such that slack upon release of the system was reduced and tong cable didn't hop pulley in elevation/twist pulley block (this 2"opening is not enough to grasp the air ratchet but is suff. for holding a target...right manip will have to hold the air tool for now. It is also notable when dealing with the tong cable system that slack can cause the tong cable to hop off the secondary pulley in the wrist joint (where two cables run through a secondary pulley that has no retention feature).

Notable during this repair was the fact the the lock-down set screws on the elevation/twist pulley block were missing. These lock down the tensioning screws once the block has been tensioned. New set screws were installed after elevation twist cables were tensioned to their nominal value of 15 in lbs.

It is my recommendation that, when the spare remote arm is fixed and there is a window that this arm come back out and the tong cable be replaced (we have 6 on hand).

  2605   Wednesday, June 05, 2024, 11:25 David WangConditioning StationStandard Operation  refilled TCS:TK2 to 27.4 inches.

refilled TCS:TK2 to 27.4 inches to compensate water lost during THC filters change.

  592   Tuesday, February 04, 2014, 09:42 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

Chad and I did a pressure test on TM2 tube Heater+(D) water line.I pressurized the D line with shop air from quick connectors(both ends) on service cap.chad applied bubble soap onto the D water block in SHC. The test started from 5psi,and increased 5psi each time to 40 psi. From 5 to 35 psi, no bubble has been found on water block. At 40 psi , bubble appeared from blind blank off seal , but not from soldering joints. Since the o-ring seal for the blank off is  vacuum seal , but not for pressurizing, It is understandable the seal could not hold 40 psi pressure air. No bubble had been found on the D water block soldering joints .See attachment pictures.

Attachment 1: 015.JPG
015.JPG
Attachment 2: 016.JPG
016.JPG
Attachment 3: 021.JPG
021.JPG
Attachment 4: 018.JPG
018.JPG
Attachment 5: 017.JPG
017.JPG
Attachment 6: 019.JPG
019.JPG
Attachment 7: 020.JPG
020.JPG
Attachment 8: 029.JPG
029.JPG
Attachment 9: 028.JPG
028.JPG
Attachment 10: 029.JPG
029.JPG
  598   Thursday, February 13, 2014, 13:30 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

Chad and I did the pressure test on TM2tube heater+(D) water  line at SHC with shop air.We tested from 30psi to 80psi on both side of D line. The bubbles were found at 50-55psi on blank off seal in SHC.

  599   Thursday, February 13, 2014, 14:15 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

David Wang wrote:

Chad and I did the pressure test on TM2tube heater+(D) water  line at SHC with shop air.We tested from 30psi to 80psi on both side of D line. The bubbles were found at 50-55psi on blank off seal in SHC.

 I would like to correct this E-LOG. There is no real  leaking bubble had been found during the whole test according to the information supplied by Chad  Fisher during  this afternoon meeting. I would like to attach some pictures took from TH during this test.

Attachment 1: 007.JPG
007.JPG
Attachment 2: 008.JPG
008.JPG
Attachment 3: 013.JPG
013.JPG
  2549   Wednesday, March 13, 2024, 11:12 Keith C NgAssembly/Bench TestRepairTM3 optics tray for tm3

Alignment notes attached for the optics tray for the refurbished tm3 with the new service and source tray.

 

*Note: Drive screw bracket sheared off during alignment check with source tray. The drive bracket was replaced. The optics tray was re checked. The front element was .015 to left and centered u/d. The rear element remained the same. The center element could not be checked to do the assembly.

Attachment 1: 20240313_optics_tray_alignment_notes.pdf
20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf
  1793   Tuesday, September 25, 2018, 08:01 chad fisherSouth Hot-CellStandard OperationTM2nSiC#1nSiC#1 install

On September 18th installation of nSiC#1 was attempted on TM2. As usual, new fasteners were tested previous to insertion into hot cell and employed during installation. the last fastener to be installed was for the circuit D block. The fastener/air ratchet stalled immediately indicating a problem. The fastener was removed and a an attempt was made trying a new spare fastener. That fastener also jammed right away but could not be removed or installed any further.

 

A breaker bar was employed to achieve more torque and the fastener was able to be loosened, although it would not come completely out, dangling and wobbling like it was free. A claw type bar was used to add slight pressure to the fastener while it was loosened allowing the fastener to undo the rest of the way.

Target was removed and discovered that that insulator supporting circuit c and d blocks was quite broken and that a few chunks had fallen off. It was also notice that boefore the breaker bar had been employed that a piece of ceramic was on the table suggesting that the ceramic had been at least partially broken at the time of removal of the previous target. Also, the threads of the insert for circuit d showed damage an swarf.

Swarf was vacuum claned out of the circuit d thread insert and a machine tap ran through the insert twice.

nSiC#1 was reinstalled with new waterline gaskets and new c and d circuit fasteners with a little bit of the first 2-3 threads lightly coated with vacuum grease.

High current fasteners torqued to 130 in lbs.

Attachment 1: 20180919_132304.jpg
20180919_132304.jpg
Attachment 2: 20180919_143535.jpg
20180919_143535.jpg
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

  1334   Wednesday, August 24, 2016, 11:06 Travis CaveSouth Hot-CellStandard OperationTM2Ta#49module moved and electrical check

TM#2 with Ta#49 has had its electrical check and was moved to the conditioning station. see the attached pdf for the electrical check details.

The electrical check has been edited to reflect that well the original has been just not the PDF.

Attachment 1: TM2_elechk_SiC34_SHC.PDF
TM2_elechk_SiC34_SHC.PDF
  75   Monday, March 12, 2012, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moved

TM#1 has been moved from the south hot cell to the north east silo, move went well.